DocumentCode :
849466
Title :
Fast generation shedding equipment based on the observation of swings of generators
Author :
Takahashi, M. ; Matsuzawa, K. ; Sato, M. ; Omata, K. ; Tsukui, R. ; Nakamura, T. ; Mizuguchi, S.
Author_Institution :
Tokyo Electric Power Co., Japan
Volume :
3
Issue :
2
fYear :
1988
fDate :
5/1/1988 12:00:00 AM
Firstpage :
439
Lastpage :
446
Abstract :
A novel method and recently developed stabilizing equipment to prevent the loss of synchronism of generators in pumped-storage plants due to spreading are presented. The method includes functions to estimate the swing of each generator by using online generator output sampled 600 times per second after an occurrence of a disturbance (such as a fault, faulty equipment, etc). Generator swing 200-300 milliseconds ahead and loss of synchronism between generators in pumped-storage plants and those in thermal and nuclear plants can be predicted 200-300 ms ahead, and the number of generators that must be shed to maintain stability can be decided
Keywords :
electric generators; load shedding; nuclear power stations; power plants; power station load; pumped-storage power stations; disturbance; fast generation shedding equipment; generator swing; generator synchronism loss prevention; nuclear plants; pumped-storage plants; thermal power plants; Fault detection; Frequency synchronization; Nuclear power generation; Power generation; Power system faults; Power system stability; Power system transients; Power systems; Steady-state; Thermal stability;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/59.192894
Filename :
192894
Link To Document :
بازگشت