• DocumentCode
    849570
  • Title

    The Rockport plant-analysis of temporary fast turbine valving tests

  • Author

    Pasternack, B.M. ; Bhatt, N.B.

  • Author_Institution
    American Electric Power Service Corp., Columbus, OH, USA
  • Volume
    3
  • Issue
    2
  • fYear
    1988
  • fDate
    5/1/1988 12:00:00 AM
  • Firstpage
    529
  • Lastpage
    540
  • Abstract
    Temporary fast turbine valving (TFTV) field tests were carried out on AEP´s 1300 MW Rockport unit. Tests at various unit loading levels verified the functional aspects of the TFTV scheme, including the control and intercept valve-stroke characteristics and the rapid reduction of mechanical driving power. An analysis of the mechanical and electrical performance characteristics of the Rockport unit during TFTV is presented. A comparison of the test measurements with digital simulation results is provided to validate the simulation tools and models commonly used in system dynamics studies
  • Keywords
    digital simulation; electrical engineering computing; power stations; turbines; 1300 MW; Rockport plant; control; digital simulation; electrical performance; intercept valve-stroke characteristics; mechanical driving power; simulation tools; temporary fast turbine valving tests; Boilers; Packaging; Power system planning; Power system stability; Power system transients; Relays; Senior members; System testing; Turbines; Valves;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.192904
  • Filename
    192904