• DocumentCode
    850377
  • Title

    Qualifying facilities and their effect on generation planning

  • Author

    Keppeler, James G.

  • Author_Institution
    Florida Power Corp., St. Petersburg, FL, USA
  • Volume
    3
  • Issue
    4
  • fYear
    1988
  • fDate
    11/1/1988 12:00:00 AM
  • Firstpage
    1738
  • Lastpage
    1740
  • Abstract
    Since the enactment of the Public Utilities Regulatory Policies Act in 1978, US utilities have been required to purchase energy and/or capacity from cogenerators and small-power producers meeting Federal Energy Regulation Commission Qualifying Facility (QF) standards, and to operate in parallel with those facilities serving their own loads. The author presents methods used by Florida Power Corporation to project both its potential loss in sales (energy and demand) and the amount of capacity and energy which are expected to be built by QFs to help meet Florida Power Corporation´s future needs. Contract provisions for power purchases from qualifying facilities to assure availability and reliability are also detailed
  • Keywords
    electric power generation; electricity supply industry; load management; USA; availability; capacity; demand; electric power generation; electricity supply industry; generation planning; load management; power purchases; power system interconnection; reliability; standards; utilities; Availability; Contracts; Marketing and sales; Mining industry; Nuclear power generation; Petroleum; Production systems; Pulp and paper industry; Pulp manufacturing; Wood industry;
  • fLanguage
    English
  • Journal_Title
    Power Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0885-8950
  • Type

    jour

  • DOI
    10.1109/59.192989
  • Filename
    192989