Title
Audible noise performance of the first three-phase ultra-high voltage transmission test line at EPRI´s project UHV
Author
Comber, M.G. ; Nigbor, Richard J.
Author_Institution
General Electric Company, Pittsfield, Massachusetts
Volume
95
Issue
4
fYear
1976
fDate
7/1/1976 12:00:00 AM
Firstpage
1105
Lastpage
1114
Abstract
A three-phase ultra-high voltage transmission test line at EPRI´s Project UHV was energized in January 1975. Analyses of the audible noise performance of the first six-months of energization are presented. The result of long-term energization during foul-weather are reported in terms of cumulative frequency distributions, lateral profiles and frequency spectra. Audible noise variations with voltage in rain and fair weather are also presented. Results are compared with calculations made on the basis of single-phase tests. Good agreement between measured and calculated performances is demonstrated.
Keywords
Acoustic noise; Books; Conductors; Corona; Frequency; Phase measurement; Power transmission lines; Testing; Transmission line measurements; Voltage;
fLanguage
English
Journal_Title
Power Apparatus and Systems, IEEE Transactions on
Publisher
ieee
ISSN
0018-9510
Type
jour
DOI
10.1109/T-PAS.1976.32203
Filename
1601805
Link To Document