• DocumentCode
    852394
  • Title

    CEBAF´s SRF cavity manufacturing and some performance limitations

  • Author

    Benesch, J.F. ; Mammosser, J.

  • Author_Institution
    Continuous Electron Beam Accel. Facility, Newport News, VA, USA
  • Volume
    5
  • Issue
    2
  • fYear
    1995
  • fDate
    6/1/1995 12:00:00 AM
  • Firstpage
    834
  • Lastpage
    836
  • Abstract
    Construction of the CEBAF (Continuous Electron Beam Accelerator Facility) recirculating linac represents the largest scale application of superconducting RF (SRF) technology to date. The accelerating structures in CEBAF are 169 pairs of 1.5 GHz SRF five-cell cavities-9 pairs in an injector and 80 pairs each in two linacs. Commissioning is now underway, with full energy beam expected in early 1995. All of the cavities have been assembled and have completed RF testing at 2.0 K in vertical dewars and in the accelerator. There was a significant reduction in performance in the accelerator. The difference in Q is ascribed to hydride precipitation enhanced by the slower cooldown in the accelerator.<>
  • Keywords
    accelerator RF systems; accelerator cavities; electron accelerators; electron device manufacture; superconducting cavity resonators; 1.5 GHz; 2 K; CEBAF; CEBAF recirculating linac; Continuous Electron Beam Accelerator Facility; RF testing; accelerating structures; hydride precipitation; performance limitations; superconducting RF cavity manufacture; vertical dewars; Acceleration; Assembly; Electron accelerators; Electron beams; Life estimation; Linear particle accelerator; Manufacturing; Radio frequency; Structural beams; Testing;
  • fLanguage
    English
  • Journal_Title
    Applied Superconductivity, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1051-8223
  • Type

    jour

  • DOI
    10.1109/77.402677
  • Filename
    402677