Title :
Installation of the first bulk power 380 kV underground transmission cable system in Saudi Arabia
Author :
Schneider, P. ; Wada, Y. ; Yoshida, N. ; Miura, I.
Author_Institution :
Lahmeyer Int. GmbH, Frankfurt, West Germany
Volume :
3
Issue :
4
fYear :
1988
fDate :
10/1/1988 12:00:00 AM
Firstpage :
1318
Lastpage :
1325
Abstract :
The design, manufacture, testing and installation of the 380 kV long-distance bulk power underground transmission line installed in Jeddah, Kingdom of Saudi Arabia, are discussed. The line consists of two routes with a length of 14.2 km and 12.6 km, respectively. It has a double circuit of 380 kV, 1600-mm2, self-contained oil-filled cable directly buried in the ground. It is expected that some of the techniques developed for this project will be applicable to other, similar projects in the Middle East region
Keywords :
underground cables; underground transmission systems; 380 kV; Jeddah; Saudi Arabia; long-distance bulk power underground transmission line; self-contained oil-filled cable; Conductivity; Cooling; Costs; Oil filled cables; Power cables; Power generation; Roads; Soil measurements; Substations; Thermal resistance;
fLanguage :
English
Journal_Title :
Power Delivery, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8977
Type :
jour
DOI :
10.1109/61.193926
Filename :
193926
Link To Document :
بازگشت