• DocumentCode
    854273
  • Title

    Standardized electrical auxiliary system for snupps

  • Author

    Killen, T.S. ; Damar, R.M.

  • Author_Institution
    Bechtel Power Corporation, Gaithersburg, Maryland
  • Volume
    96
  • Issue
    5
  • fYear
    1977
  • Firstpage
    1602
  • Lastpage
    1607
  • Abstract
    Standardization of the design has been a prime objective for the five SNUPPS PWR nuclear units. Described is the approach taken to achieve this objective in the electrical auxiliary system even considering unique site characteristics for each unit. Also identified are portions of the system which could not be standardized. The result is a successful single design for the nuclear power plant electrical auxiliary system.
  • Keywords
    Cities and towns; Feeds; Licenses; Nuclear power generation; Power generation; Power industry; Power supplies; Power system interconnection; Standardization; Transformers;
  • fLanguage
    English
  • Journal_Title
    Power Apparatus and Systems, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9510
  • Type

    jour

  • DOI
    10.1109/T-PAS.1977.32489
  • Filename
    1602091