DocumentCode :
855961
Title :
KEK Accelerator Facilities and Tristan Project
Author :
Kamei, T. ; Kimura, Y.
Author_Institution :
KEK, National Laboratory for High Energy Physics Oho-machi, Tsukuba-gun, Ibaraki-ken, 305, Japan
Volume :
28
Issue :
3
fYear :
1981
fDate :
6/1/1981 12:00:00 AM
Firstpage :
2052
Lastpage :
2054
Abstract :
KEK 12 GeV PS continues stable operation and the maximum beam intensity has reached 4.1 x 1012 ppp, over twice of the design value. Since last June the booster delivers the 500 MeV protons to the Booster Synchrotron Utilization Facility (BSF), and pulsed neutrons and pulsed mesons are successfully produced. The 2.5 GeV electron linac and the storage ring, dedicated for a synchrotron radiation facility, will be completed in one year. The new version of TRISTAN plan has a 25 GeV electron ring and a 300 GeV proton ring. The e+-e- ring of 30 GeV will be constructed from FY 1981 as phase I of TRISTAN.
Keywords :
Acceleration; Electrons; High power amplifiers; Linear particle accelerator; Particle beam injection; Particle beams; Polarization; Protons; Resonance; Structural beams;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1981.4331590
Filename :
4331590
Link To Document :
بازگشت