DocumentCode :
859153
Title :
Zero downtime
Author :
Eaton, Danny W. ; Rama, John C. ; Macak, Amy L.
Author_Institution :
Marathon Pet. Co., Marathon, FL
Volume :
14
Issue :
6
fYear :
2008
Firstpage :
14
Lastpage :
18
Abstract :
The strategy to achieve the desired outcome of five-year operation without downtime was discussed. This article provides an update of the experience with the new systems, problems encountered, successes achieved, and lessons learned. The strategy to extend the reliable operation of the key electrical equipment will be discussed as well as the maintenance challenges to prepare the drive trains for the next long run following the current one.
Keywords :
maintenance engineering; reliability; variable speed drives; electrical equipment reliabilty; maintenance engineering; variable speed drives; Circuit faults; Combustion; Compressors; Costs; Drives; FCC; Maintenance; Petroleum; Pulse width modulation; Refining;
fLanguage :
English
Journal_Title :
Industry Applications Magazine, IEEE
Publisher :
ieee
ISSN :
1077-2618
Type :
jour
DOI :
10.1109/MIAS.2008.929336
Filename :
4623734
Link To Document :
بازگشت