Title :
Status of the National Synchrotron Light Source Project
Author_Institution :
National Synchrotron Light Source Brookhaven National Laboratory Upton, N. Y. 11973
fDate :
6/1/1981 12:00:00 AM
Abstract :
The National Synchrotron Light Source is in its final stages of construction, and as the turn-on time for the 700 MeV VUV storage ring draws near, an overview of the project is presented. Emphasis is placed on the linac and booster synchrotron performance and the status of major subsystems.
Keywords :
Acceleration; Electrons; Laboratories; Light sources; Linear accelerators; Linear particle accelerator; Magnets; Storage rings; Synchrotrons; Testing;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1981.4332040