DocumentCode :
861983
Title :
Initial Operation of a 100% Duty Factor 3 MeV Alvarez Linac
Author :
Ungrin, J. ; Brown, J.C. ; Chidley, B.G. ; McMichael, G.E. ; Schriber, S.O.
Author_Institution :
Atomic Energy of Canada Limited Chalk River Nuclear Laboratories Chalk River, Ontario KOJ 1JO
Volume :
28
Issue :
3
fYear :
1981
fDate :
6/1/1981 12:00:00 AM
Firstpage :
3495
Lastpage :
3497
Abstract :
A 100% duty factor 3 MeV Alvarez linac at the Chalk River Nuclear Laboratories has been successfully rf conditioned. A buncher has been commissioned and cw proton beams up to 1.2 mA have been accelerated to 3 MeV. Renewed experiments on drift tube stem mountings show stem currents to be the major cause of bellows overheating. A 2ß¿ Alvarez tank that models the geometry of a higher energy ß¿ Alvarez tank is being built to test new linac design concepts at 100% duty factor.
Keywords :
Acceleration; Bellows; Copper; Ion accelerators; Laboratories; Linear particle accelerator; Particle beams; Proton accelerators; Rivers; Testing;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1981.4332148
Filename :
4332148
Link To Document :
بازگشت