  • Title

    The ten billion dollar dam

  • Author

    Conti, Juan Pablo

  • Volume
    20
  • Issue
    1
  • fYear
    2006
  • Firstpage
    23
  • Lastpage
    26
  • Abstract
    This paper reports on the nearing completion of Argentina´s largest hydroelectric power station, Yacyreta, despite all the controversies surrounding its construction. Built jointly by Argentina and Paraguay to harness the hydraulic resources of the Parana River, the project has been plagued by a series of delays and corruption scandals. Beyond the corruption, however, the key problem with Yacyreta is the fact that operating at 60% of full capacity translates into poorer production figures than those originally anticipated. Should the plant have been operating at its full capacity, it would be able to supply about 25% of all electricity consumed by the country. In the meantime, the Argentinian government plans to launch new power stations in 2007 until Yacyreta´s untapped potential becomes available by 2009.
  • Keywords
    dams; hydroelectric power stations; reservoirs; Argentina; Paraguay; Parana River; Yacyreta hydroelectric power station; corruption; hydraulic resources; overspending; power generation capacity;
  • fLanguage
    English
  • Journal_Title
    Power Engineer
  • Publisher
    iet
  • ISSN
    1479-8344
  • Type

    jour

  • DOI
    10.1049/pe:20060103
  • Filename
    1605003