• DocumentCode
    865724
  • Title

    Initial Operation of the Holifield Facility

  • Author

    Ball, James B.

  • Author_Institution
    Oak Ridge National Laboratory, Oak Ridge, Tennessee 37830
  • Volume
    30
  • Issue
    2
  • fYear
    1983
  • fDate
    4/1/1983 12:00:00 AM
  • Firstpage
    1363
  • Lastpage
    1366
  • Abstract
    The Holifield Facility has been completed and operation for experiments is well under way. Experience to date with operation of the 25 MV Pelletron has shown it to be a sturdy and smoothly operating accelerator. The inability to operate reliably at terminal voltages of 20 MV and above has been a disappointment but we have begun modifications aimed at the problem believed to be the source of this limitation. We are confident that with continued efforts of ORNL and NEC the machine will be brought to full potential. Experience with booster operation of ORIC has been particularly successful and has provided a new range of ion-energy combinations for use in experiments. The long term stability of this operational mode illustrates the power and flexibility of a tandem accelerator as an injector for a cyclotron booster.
  • Keywords
    Buildings; Cyclotrons; Electrostatics; Gas insulation; Ion accelerators; Laboratories; Life estimation; Notice of Violation; Testing; Voltage;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1983.4332533
  • Filename
    4332533