Title :
Status of the Energy Saver
Author_Institution :
Fermi National Accelerator Laboratory Batavia, IL 60510
Abstract :
The one-TeV synchrotron which has been under construction at Fermilab is nearly complete and is now entering the commissioning phase. The assembly and testing of the ring of more than 1000 superconducting magnets with its associated cryogenic, vacuum, power, R.F., controls and safety systems has gone extremely well.
Keywords :
Accelerator magnets; Apertures; Assembly; Helium; Packaging; Structural beams; Superconducting cables; Superconducting coils; Superconducting magnets; Synchrotrons;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1983.4332688