DocumentCode
867263
Title
Status of KEK TRISTAN Project
Author
Nishikawa, T. ; Horikoshi, G.
Author_Institution
KEK, National Laboratory for High Energy Physics Oho-machi, Tsukuba-gun, Ibaraki-ken, 305, Japan
Volume
30
Issue
4
fYear
1983
Firstpage
1983
Lastpage
1987
Abstract
Status of the KEK TRISTAN project, the Phase I of which has been approved since 1981, is reported with an emphasis on its accelerator design and construction. The design of accelerator complex has mostly been fixed. Construction of accelerator enclosure and production of accelerator components are under way with a target day for the first e+ e- collisions in 1986.
Keywords
Acceleration; Colliding beam accelerators; Electrons; Laboratories; Linear accelerators; Linear particle accelerator; Physics; Positrons; Proton accelerators; Storage rings;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1983.4332692
Filename
4332692
Link To Document