• DocumentCode
    869886
  • Title

    Managing load data at Virginia Power

  • Author

    Tweed, Norman B., Jr. ; Stites, Brandon E.

  • Volume
    5
  • Issue
    1
  • fYear
    1992
  • Firstpage
    25
  • Lastpage
    29
  • Abstract
    The use of real-time data and what is referred to as semi-real-time data for asset management is described. The basic premise behind asset management is to utilize existing facilities to full capacity before installing new ones. Facility load data is made readily available to various company departments (such as metering, substation band system protection, budgeting, marketing, system planning, and division planning) as well as system and division operations by tying information networks together. Having access to this data allows unique approaches to reliability and efficiency in serving customers.<>
  • Keywords
    load management; power system computer control; Virginia Power; asset management; budgeting; division planning; efficiency; load data management; marketing; metering; reliability; substation protection; system planning; system protection; Asset management; Capacity planning; Distributed parameter circuits; Energy management; Load management; Power system management; Power system planning; Real time systems; SCADA systems; Substations;
  • fLanguage
    English
  • Journal_Title
    Computer Applications in Power, IEEE
  • Publisher
    ieee
  • ISSN
    0895-0156
  • Type

    jour

  • DOI
    10.1109/67.111468
  • Filename
    111468