DocumentCode
877059
Title
Status Report on the DESY II Synchrotron
Author
Berghaus, U. ; Bothe, W. ; Böttcher, H. ; Dalbkowski, E. ; Ebeling, W. ; Febel, A. ; Fischer, R. ; Hartwig, H. ; eins, D. ; Heller, H.R. ; Hemmie, G. ; Jacobs, G. ; Kouptsidis, J. ; Kriens, W. ; Meyer, G. ; Musfeldt, H. ; Neubau, F. ; Oentrich, W. ; Peter
Author_Institution
Deutsches Elektronen-Synchrotron DESY NotkestraÃ\x9fe 85, 2000 Hamburg 52, W.-Germany
Volume
32
Issue
5
fYear
1985
Firstpage
1641
Lastpage
1643
Abstract
After approval of the construction of the new separated function electron synchrotron, DESY II, in May 1983, the design and fabrication of all components was completed and the new machine fully installed during a four month winter shutdown from Nov. 84 until Feb. 85. The new machine will be tested in parallel with normal operation of the old 7 GeV synchrotron, DESY I, by using 200 MeV electrons injected from the upgraded Linac I. Provisional power supplies run the magnets up to 1 GeV. During a second shutdown in winter 85/86 it is planned to install full magnetand rf-power and to connect all beam transfer lines to PETRA and DORIS. DESY I will then be turned off and most of the components will be used to form a new proton synchrotron (DESY III) for the HERA e--p project. An updated parameter list and first results from the initial tests of DESY II will be presented.
Keywords
Electrons; Fabrication; Linear particle accelerator; Magnetic separation; Magnets; Notice of Violation; Power supplies; Structural beams; Synchrotrons; Testing;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1985.4333677
Filename
4333677
Link To Document