DocumentCode
878822
Title
Transmission voltage recovery delayed by stalled air conditioner compressors
Author
Williams, Bradley R. ; Schmus, Wayne R. ; Dawson, Douglas C.
Author_Institution
Southern California Edison Co., Rosemead, CA, USA
Volume
7
Issue
3
fYear
1992
fDate
8/1/1992 12:00:00 AM
Firstpage
1173
Lastpage
1181
Abstract
Southern California Edison Company (SCE) has experienced delayed voltage recovery following fault clearing on the transmission system. The authors describe these occurrences and document the studies which successfully modeled the voltage recovery process. The studies showed how the stalling of single-phase air conditioner compressors following a power system fault was the root cause of delayed voltage recovery. Tests of air conditioner response to voltage dips are documented. The results of these tests are used to derive the mathematical load models used in voltage recovery studies
Keywords
air conditioning; compressors; electrical faults; power systems; transmission networks; Southern California Edison Company; delayed voltage recovery; fault clearing; mathematical load models; power system fault; stalled air conditioner compressors; transmission system; Air conditioning; Compressors; Delay; Impedance; Induction motors; Load modeling; Low voltage; Power system faults; Synchronous motors; Testing;
fLanguage
English
Journal_Title
Power Systems, IEEE Transactions on
Publisher
ieee
ISSN
0885-8950
Type
jour
DOI
10.1109/59.207331
Filename
207331
Link To Document