• DocumentCode
    879878
  • Title

    Efficient Capture in an Accumulator Ring of 20,000 Turns of Beam Injected from TRIUMF

  • Author

    Raparia, D. ; Planner, C.W. ; Mackenzie, G.H. ; Richardson, J.R.

  • Author_Institution
    TRIUMF, Vancouver, B. C., Canada V6T 2A3
  • Volume
    32
  • Issue
    5
  • fYear
    1985
  • Firstpage
    2456
  • Lastpage
    2458
  • Abstract
    For the TRIUMF KAON Factory a 450 MeV Accumulator ring is required to match the cw 100 ¿A beam from the isochronous cyclotron to the first acceleration stage, a 50 Hz 3 GeV Booster Synchrotron. H- ions would be charge exchange injected into the Accumulator through a 250 ¿ g cm-2 carbon foil. Approximately 2 A of protons would be accumulated over the 20 ms Booster period and transferred to the Booster in one turn. The first protons injected circulate for about 2×104 turns before extraction. If a substantial fraction of the circulating protons traverse the foil each turn, both the lifetime of the foil and the amount of beam lost would be unacceptable. The proposed acceptances of the Accumulator are 100 ¿ ¿m horizontally, 30 ¿ ¿m vertically and 7.6×10-2 eV-s longitudinally. These are much larger than the TRIUMF emittances of 2 ¿ mmmrad in each transverse plane and 10-3 eV-s longitudinally. It is shown that with simultaneous stacking in the transverse and longitudinal acceptances it is possible to reduce the number of foil traversals per proton to an acceptable number ~ 100.
  • Keywords
    Acceleration; Cyclotrons; Frequency estimation; Mesons; Particle beams; Production facilities; Protons; Stacking; Synchrotrons; Voltage;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1985.4333945
  • Filename
    4333945