• DocumentCode
    882322
  • Title

    First Operation of the TASCC Beam Bunching System

  • Author

    Bigham, C.B. ; Alexander, T.K. ; Burton, R.J. ; Heighway, E.A. ; McGregor, J.E. ; Stock, E.P.

  • Author_Institution
    Atomic Energy of Canada Limited, Research Company Chalk River Nuclear Laboratories Chalk River, Ontario, Canada KOJ lJO
  • Volume
    32
  • Issue
    5
  • fYear
    1985
  • Firstpage
    2763
  • Lastpage
    2765
  • Abstract
    The Chalk River Tandem Accelerator Superconducting Cyclotron (TASCC) system uses a low-energy buncher (LER) and a high-energy rebuncher (HER) to prodtice the required bunched beam at the cyclotron injection stripper foil. The LEB modulates the < 300 keV beam from the negative ion source with a f¿undamental plus 2nd harmonic approximation to an ideal saw tooth to give a time focus at the stripper in the tandem accelerator terminal. The HEB, operating at the 2nd or 4th harmonic, corrects for debunching after the stripper and produces a new time focus at the cyclotron stripper. Transit time jitter through the tandem accelerator is corrected by a phase stabilizing circuit using both energy analysis after the HEB and a correlation with a capacitive phase probe signal . In the first experiments with a low energy 12C beam, the LEB produced bunch lengths of about 1.6 ns and the HEB produced the expected energy dispersion. Beam tests will be described.
  • Keywords
    Circuits; Cyclotrons; Ion accelerators; Ion sources; Jitter; Optical modulation; Particle beams; Rivers; Signal analysis; Teeth;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1985.4334173
  • Filename
    4334173