Title :
Accelerator Systems of the SSC
Author_Institution :
Supercollider, URA Design Center c/o Lawrence Berkeley Laboratory, MS 90-4040 Berkeley, California 94720
Abstract :
The objectives, organization, and immediate plans for the Accelerator Systems Division of the SSC have been presented. The preliminary results of a study on the commisioning and operational characteristics of the SSC as they are influenced by the various magnet types has been presented. The status of the present R&D work has been described, with particular attention to the experiment on synchrotron radiation induced gas desorption.
Keywords :
Costs; Electric breakdown; Laboratories; Power supplies; Power system protection; Research and development; Structural beams; Superconducting magnets; System testing; Variable speed drives;
Journal_Title :
Nuclear Science, IEEE Transactions on
DOI :
10.1109/TNS.1985.4334395