DocumentCode :
890934
Title :
Generation Expansion Planning for Systems with a High Share of Hydro Power
Author :
Nordlund, P. ; Sjelvgren, D. ; Pereira, M.V.F. ; Bubenko, J.A.
Author_Institution :
The Swedish State Power Board Vÿllingby, Sweden
Volume :
2
Issue :
1
fYear :
1987
Firstpage :
161
Lastpage :
167
Abstract :
This paper presents a method for integrating a detailed model of the hydroelectric system into existing power system planning tools. The purpose of the hydro model is not primarily to optimize hydro expansion, but to represent the influence of hydro regulation on the thermal system expansion. Stochastic production costing routines are used to calculate operating costs as a function of hydro production. Linear programming is used to determine the hydro production schedule that minimizes production costs along the planning period, taking into account a number of constraints in the hydro production system. A study with 16 cascaded hydro plants and 25 thermal units is presented and discussed.
Keywords :
Cost function; Costing; Hydroelectric power generation; Linear programming; Power generation; Power system modeling; Power system planning; Production systems; Stochastic processes; Thermal expansion;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/TPWRS.1987.4335093
Filename :
4335093
Link To Document :
بازگشت