DocumentCode :
892193
Title :
Problems in Coping with the Proliferation of Interchange Schedules
Author :
Schulte, R. P. ; Barker, J. V. ; Cottom, R. E. ; McReynolds, M. P. ; Meyer, F. ; Woodward, T. R. ; Yan, H. H.
Volume :
2
Issue :
4
fYear :
1987
Firstpage :
883
Lastpage :
889
Abstract :
This paper is one of a series presented on behalf of the System Operations Subcommittee with the intent of focusing industry attention on current problems faced by electric utility operators. This paper contains four "short note reports" from authors in different areas of the electric power industry. The issues of evaluation, scheduling, control, and accounting are addressed.
Keywords :
Electrical equipment industry; Environmental economics; Fuel economy; Job shop scheduling; Open loop systems; Personnel; Power generation economics; Power industry; Power systems; Processor scheduling;
fLanguage :
English
Journal_Title :
Power Systems, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8950
Type :
jour
DOI :
10.1109/TPWRS.1987.4335268
Filename :
4335268
Link To Document :
بازگشت