• DocumentCode
    896530
  • Title

    Plans for brookhaven FASTBUS during the next π Ã\x97 1016 nanoseconds

  • Author

    Leipuner, L.B. ; Larsen, R. ; Makowiecki, D. ; Morse, W. ; Rudolf, T. ; Sims, W. ; Blatt, S. ; Campbell, M. ; Kasha, H. ; Schmidt, M.

  • Author_Institution
    Brookhaven National Laboratory, Upton, New York 11973
  • Volume
    28
  • Issue
    6
  • fYear
    1981
  • Firstpage
    4577
  • Lastpage
    4580
  • Abstract
    During this period new modules and devices will be built to be used in Experiment 749 at the A.G.S. Included will be /spl I.itilde/200 channels of A-D converters for Pb-Glass Cerenkov counters, 2000 channels of proportional wire chamber readout, cable segments, segment interconnects, a new unibus interface, and a new onsegment processor. These items and perhaps others will be ready by the end of 1981.
  • Keywords
    CAMAC; Counting circuits; Fastbus; Laboratories; Latches; Mesons; Physics computing; Polarization; Testing; Wire;
  • fLanguage
    English
  • Journal_Title
    Nuclear Science, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9499
  • Type

    jour

  • DOI
    10.1109/TNS.1981.4335768
  • Filename
    4335768