DocumentCode :
897174
Title :
Geotechnical Instrumentation and Data Acquisition System for Site and Preliminary Design Validation at the DOE Waste Isolation Pilot Plant, Eddy County, NM
Author :
Howes, E.V. ; Reum, J.W.
Author_Institution :
Bechtel National Incorporated, P.O. Box 3965, San Francisco, Ca. 94119
Volume :
29
Issue :
1
fYear :
1982
Firstpage :
247
Lastpage :
251
Abstract :
The WIPP site has unique requirements for monitoring geologic stress build-up, convergence and creep in in-elastic salt rock. The status of site construction activities and the role of geotechnical instrumentation in the WIPP mission are covered including the special problems of deformation and stress measurements in salt. A brief discussion of the geotechnical instruments specified is presented along with the requirements of the readout equipment. Instrument locations, wiring information, data acquisition system block diagrams and functional requirements of the data logger are also shown.
Keywords :
Creep; Data acquisition; Foot; Geologic measurements; Instruments; Shafts; Soil measurements; Strain measurement; Stress measurement; US Department of Energy;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1982.4335837
Filename :
4335837
Link To Document :
بازگشت