DocumentCode :
897914
Title :
Current calculation methodology for manufacturing facilities with intermittent loads
Author :
Prabhakara, F.S. ; Kazibwe, Wilson E.
Author_Institution :
Power Technol. Inc., Schenectady, NY, USA
Volume :
28
Issue :
2
fYear :
1992
Firstpage :
324
Lastpage :
328
Abstract :
The authors present a direct probabilistic method of calculating thermal current ratings due to a large number of intermittent loads such as welders and robots. The welders and robots can have different currents and duty cycles and connect at different points on a distribution network that is not necessarily radial. Regular loads such as motor loads and other process loads can also be represented. The method can be easily extended to single-phase welders, i.e., for a three-phase distribution system analysis
Keywords :
distribution networks; load (electric); manufacturing industries; probability; intermittent loads; manufacturing facilities; motor loads; probabilistic method; process loads; robots; single-phase welders; thermal currents rating calculation; three-phase distribution system analysis; welders; Automotive engineering; Industrial power systems; Load flow; Power demand; Production facilities; Senior members; Service robots; Thermal loading; Transformers; Welding;
fLanguage :
English
Journal_Title :
Industry Applications, IEEE Transactions on
Publisher :
ieee
ISSN :
0093-9994
Type :
jour
DOI :
10.1109/28.126737
Filename :
126737
Link To Document :
بازگشت