• DocumentCode
    902000
  • Title

    Controller testing facility on 32.5 MW water turbine

  • Author

    Winning, D.J. ; Aitken, K.H. ; Grant, N.F. ; Marshall, A.G. ; Findlay, D.G.E.

  • Author_Institution
    University of Glasgow, Department of Electronics and Electrical Engineering, Glasgow, UK
  • Volume
    127
  • Issue
    6
  • fYear
    1980
  • fDate
    11/1/1980 12:00:00 AM
  • Firstpage
    357
  • Lastpage
    359
  • Abstract
    As part of a collaborative programme of work between university and industry on the control of hydro-generating units supplying power to the UK national grid, equipment has been installed on a 32.5 MW unit which permits the testing of new controllers in a realistic, operational environment. A central feature of this equipment, which includes a new independent high-pressure servomotor, is that it permits the generating unit to be returned quickly to operational use with its existing controller. Full integration with the power station operator´s controls, automatic control scheme and protection, permit the controllers under test to be evaluated under normal operational conditions.
  • Keywords
    controllers; environmental testing; hydraulic turbines; machine testing; test facilities; 32.5 MW water turbine; controller testing facility; operational environment;
  • fLanguage
    English
  • Journal_Title
    Generation, Transmission and Distribution, IEE Proceedings C
  • Publisher
    iet
  • ISSN
    0143-7046
  • Type

    jour

  • DOI
    10.1049/ip-c.1980.0056