DocumentCode :
902214
Title :
Report on bus transfer. III. Full scale testing and evaluation
Author :
Young, P.L. ; Snider, W.L. ; Higgins, T.A. ; Holley, H.J.
Author_Institution :
Southern Co. Services, Birmingham, AL, USA
Volume :
5
Issue :
3
fYear :
1990
fDate :
9/1/1990 12:00:00 AM
Firstpage :
477
Lastpage :
484
Abstract :
For pt.II see ibid., vol.5, no.3, p.470-6 (1990). Results from selected full-scale bus transfer tests are presented. The discussion of each test includes a comparison of the actual test results with computer simulations. Actual field tests are conducted in a manner designed to mimic normal operating conditions as closely as possible. High-speed chart recorders are utilized to gather test data. Typically, the tests are performed during a major outage or just prior to the initial start-up of a new unit. After testing, the auxiliary system computer models are modified to represent as closely as possible actual operating conditions at the time of the test
Keywords :
busbars; digital simulation; power engineering computing; power station load; power systems; testing; bus transfer; computer simulations; high speed chart recorders; normal operating conditions; outage; start-up; testing; Analytical models; Automatic testing; Computational modeling; Nuclear power generation; Performance evaluation; Power generation; Senior members; System testing; Transformers; Voltage;
fLanguage :
English
Journal_Title :
Energy Conversion, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8969
Type :
jour
DOI :
10.1109/60.105271
Filename :
105271
Link To Document :
بازگشت