DocumentCode
902494
Title
Energy Saver Partial Ring Power Tests
Author
Tool, G. ; Flora, R. ; Martin, P. ; Wolff, D.
Author_Institution
Fermi National Accelerator Laboratory P.O. Box 500 Batavia, Il. 60510
Volume
30
Issue
4
fYear
1983
Firstpage
2889
Lastpage
2891
Abstract
As installation of the Energy Saver progresses, completed sections of the ring are operated to test subsystems and their interactions. This paper describes the power and quench protection tests in the 1/8 ring operation (3/4 of A sector) completed in June, 1982, and in the more recent 1/3 ring operation of E and F sectors.
Keywords
Circuit testing; Laboratories; Monitoring; Power supplies; Protection; Resistors; Superconducting magnets; Test facilities; Thyristors; Voltage;
fLanguage
English
Journal_Title
Nuclear Science, IEEE Transactions on
Publisher
ieee
ISSN
0018-9499
Type
jour
DOI
10.1109/TNS.1983.4336514
Filename
4336514
Link To Document