DocumentCode
906403
Title
Nonoptimum compensation schemes for single pole reclosing on EHV double circuit transmission lines
Author
Thomann, Gary C. ; Lambert, Stephen R. ; Phaloprakarn, Somkiet
Volume
8
Issue
2
fYear
1993
fDate
4/1/1993 12:00:00 AM
Firstpage
651
Lastpage
659
Abstract
Optimum reactor compensation configurations for implementing single pole reclosing on EHV (extra-high-voltage), double-circuit lines have been previously investigated. However, for some applications, optimum schemes may not be practical due to constraints such as reactor physical size, operating constraints and existing equipment. The performance of nonoptimum schemes is considered using an EGAT (Electricity Generating Authority of Thailand) 328 km, 500 kV, double-circuit line as an example. Several compensation schemes were considered, and their performance was examined with both circuits in service and with one circuit out for maintenance. The analysis indicated that some schemes with reactor values considerably off optimum still provided reasonable performance
Keywords
compensation; power transmission lines; reactors (electric); 328 km; 500 kV; EHV double circuit transmission lines; Electricity Generating Authority of Thailand; reactor compensation; single pole reclosing; Capacitance; Circuit faults; Distributed parameter circuits; Inductors; Joining processes; Performance analysis; Power generation; Power transmission lines; Samarium; Voltage;
fLanguage
English
Journal_Title
Power Delivery, IEEE Transactions on
Publisher
ieee
ISSN
0885-8977
Type
jour
DOI
10.1109/61.216872
Filename
216872
Link To Document