• DocumentCode
    906535
  • Title

    China Light & Power´s project strategy

  • Author

    Brooks, R.W.

  • Author_Institution
    China Light & Power Company Limited, Kowloon, Hong Kong
  • Volume
    131
  • Issue
    6
  • fYear
    1984
  • fDate
    9/1/1984 12:00:00 AM
  • Firstpage
    222
  • Lastpage
    235
  • Abstract
    A summary of the China Light & Power Company´s background, operation up to 1975 and developments since 1975 is given, covering territory, load growth, generation, transmission, distribution, interconnection and control. Then follows a discussion on the company´s principles of project strategy applied to all projects. This is followed by a Section on how these are applied to the Castle Peak B project, dealing with alternative methods of contracting, assessment and placement of risks, plant selection, price evaluation and project management. The policies are then summarised and conclusions are drawn concerning their success.
  • Keywords
    electricity supply industry; Castle Peak B project; China Light & Power Company´s background; control; distribution; generation; interconnection; load growth; project strategy; transmission;
  • fLanguage
    English
  • Journal_Title
    Generation, Transmission and Distribution, IEE Proceedings C
  • Publisher
    iet
  • ISSN
    0143-7046
  • Type

    jour

  • DOI
    10.1049/ip-c:19840032
  • Filename
    4643772