    Jamuna River 230 kV crossing, Bangladesh. Part 2: Construction

  • Author

    Chandler, J.A. ; Hinch, L.W. ; Fair, R.I. ; Hughes, D.A. ; Peraino, J. ; Rowe, P.W.

  • Author_Institution
    Rendel Palmer & Tritton, London, UK
  • Volume
    131
  • Issue
    7
  • fYear
    1984
  • fDate
    11/1/1984 12:00:00 AM
  • Firstpage
    319
  • Lastpage
    332
  • Abstract
    Abstract: The Jamuna River crossing is part of the 230 kV east-west interconnection project which interconnects the east and west networks of the Bangladesh Power Development Board. The purpose of the interconnection is to export cheaper (gas-generated) energy from the eastern grid to the western grid, to improve system security, and, in the future, to permit west-east transfer of energy from future nuclear and coal-fired plants in the West. Part 1 of the paper describes the design of the crossing which consists of ten equal transmission-line spans of 1220 m, carried on 111 m high towers, with the two circuits arranged in delta formation. The eleven towers are supported on reinforced concrete caissons sunk some 100 m into the bed of the Jamuna River which is about 12 km wide at the site of the crossing and has a maximum recorded flow of 92 300 m/s. Part 2 deals with the method of sinking the caissons, the erection of the towers and the conductor stringing, and the construction problems encountered.
  • Keywords
    erection; overhead line conductors; poles and towers; power system interconnection; power transmission lines; 230 kV crossing; Bangladesh; Jamuna River; caissons; conductor stringing; construction problems; erection; interconnection project; power system interconnection; power transmission lines; sinking; towers;
  • fLanguage
    English
  • Journal_Title
    Generation, Transmission and Distribution, IEE Proceedings C
  • Publisher
    iet
  • ISSN
    0143-7046
  • Type

    jour

  • DOI
    10.1049/ip-c.1984.0044
  • Filename
    4643802