DocumentCode :
907711
Title :
Automatic Plant Start-Up System for BWRS
Author :
Nakai, H. ; Hirata, K. ; Tsunoda, R. ; Watanabe, M. ; Murata, Y.
Author_Institution :
Nuclear Control and Electrical Engineering Department, Nuclear Energy Group, Toshiba Corporation, Isogo Engineering Center, 8 Shinsugita-cho, Isogo-ku, Yokohama-shi, Kanagawa, Japan
Volume :
32
Issue :
1
fYear :
1985
Firstpage :
1084
Lastpage :
1089
Abstract :
An automatic plant start-up system, incorporating a process computer, is in use at Unit No. 1 of Onagawa Nuclear Power Station (a 524-MWe BWR) of Tohoku Electric Power Company. This system, based on and expanded automation techniques proven in fossilfired power plants, is the world´s first commercial base system for LWRs. The system automatically performs turbine start-up and controls reactor power by regulating reactor recirculation flow, thus reducing the operator´s workload and improving reliability, efficiency, and accuracy of plant operation. Both test data and practical operation have demonstrated the satisfactory performance of this system. This paper discusses system configuration, major functions, and results of performance tests at the factory and installation site, with special emphasis on power control.
Keywords :
Automatic control; Automation; Control systems; Inductors; Power control; Power generation; Power system reliability; Production facilities; System testing; Turbines;
fLanguage :
English
Journal_Title :
Nuclear Science, IEEE Transactions on
Publisher :
ieee
ISSN :
0018-9499
Type :
jour
DOI :
10.1109/TNS.1985.4337003
Filename :
4337003
Link To Document :
بازگشت