DocumentCode :
915639
Title :
Partial discharge testing of gas insulated substations
Volume :
7
Issue :
2
fYear :
1992
fDate :
4/1/1992 12:00:00 AM
Firstpage :
499
Lastpage :
506
Abstract :
A discussion of partial discharge (PD) testing of SF6 gas insulated substations (GISs) is based on a consensus among the experts on and associated with WG K4 of the IEEE Substations Committee. Such testing is discussed in the context of type testing, factory routine testing, testing of solid dielectric spacers, and field PD testing. The latter tends to be the most problematic and hence receives the most detailed discussion
Keywords :
gaseous insulation; partial discharges; substations; sulphur compounds; testing; SF6 gas insulated substations; factory routine testing; field partial discharge testing; partial discharge testing; solid dielectric spacers; type testing; Assembly; Costs; Dielectrics; Gas insulation; Geographic Information Systems; Interference; Partial discharges; Production facilities; Substations; Testing;
fLanguage :
English
Journal_Title :
Power Delivery, IEEE Transactions on
Publisher :
ieee
ISSN :
0885-8977
Type :
jour
DOI :
10.1109/61.127042
Filename :
127042
Link To Document :
بازگشت