DocumentCode
919883
Title
Factors to consider when upgrading transfer switching equipment to present codes and standards
Author
Castenschiold, René ; Hogrebe, Lawrence F.
Author_Institution
LCR Consulting Engineers, Green Village, NJ, USA
Volume
29
Issue
3
fYear
1993
Firstpage
510
Lastpage
514
Abstract
Some of the steps that should be considered when expanding or replacing equipment in emergency and standby power systems are discussed. The need for code conformance, reliable operation, and safety to personnel is discussed. For a better understanding, derived systems, ground-fault sensing, the impact of NEC (National Electrical Code) changes on yesterday´s and today´s installations, and the limited degree of isolation provided by three-pole transfer switches are reviewed
Keywords
emergency power supply; standards; switching; NEC; National Electrical Code; code conformance; emergency power systems; equipment upgrading; ground-fault sensing; safety; standards; standby power systems; three-pole transfer switches; transfer switching equipment; Code standards; Conductors; Fault currents; National electric code; Power system protection; Power system reliability; Power systems; Safety; Switches; Wiring;
fLanguage
English
Journal_Title
Industry Applications, IEEE Transactions on
Publisher
ieee
ISSN
0093-9994
Type
jour
DOI
10.1109/28.222419
Filename
222419
Link To Document