• DocumentCode
    922169
  • Title

    Supplying small loads at reasonable cost

  • Author

    D´Ajuz, A. ; Martinez, Manuel L B ; BLANCO, FLAVIO A F Pazo

  • Author_Institution
    Centrais Eleticas do Norte do Brazil, Rio de Janeiro, Brazil
  • Volume
    33
  • Issue
    6
  • fYear
    1996
  • fDate
    6/1/1996 12:00:00 AM
  • Firstpage
    34
  • Lastpage
    35
  • Abstract
    The hundreds of kilometres of power lines that stretch from Brazil´s under-developed areas to its big urban centers bypass many small, electricity-less towns. Excluded from the mainstream of development, their inhabitants leave en-masse for the already overpopulated cities. Eletronorte decided to find a way to improve matters. It undertook a pioneering engineering project to supply electricity to communities along and near the routes of 230-kV transmission lines. The shield-wire lines (SWL) project, as it is called, is straight forward. A symmetrical three-phase voltage system, formed of a transmission line´s two shield wires and earth, delivers reliable power to small communities along the line. The idea is to use simple balancing components to derive the symmetrical three-phase voltage system. The components are a series resistor and inductor (reactor) in the earth path, plus a capacitor branched between the two shield wires
  • Keywords
    power capacitors; power overhead lines; power transmission lines; reactors (electric); resistors; shielding; 230 kV; Brazil; capacitor; earth; electricity supply; inductor; overhead power lines; reactor; series resistor; shield wires; shield-wire lines project; small loads; symmetrical three-phase voltage system; transmission lines; Cities and towns; Costs; Earth; Inductors; Power engineering and energy; Power system reliability; Power transmission lines; Reliability engineering; Voltage; Wires;
  • fLanguage
    English
  • Journal_Title
    Spectrum, IEEE
  • Publisher
    ieee
  • ISSN
    0018-9235
  • Type

    jour

  • DOI
    10.1109/6.499945
  • Filename
    499945