DocumentCode
926177
Title
Transrapid MagLev Update
Author
Dickhart, William W., III
Author_Institution
General Manager, The Budd Company Technical Center, Fort Washington, PA 19034
Volume
2
Issue
2
fYear
1987
Firstpage
5
Lastpage
8
Abstract
The Transrapid MagLev had been under development in West Germany for a number of years under the sponsorship of the Ministry of Research and Technology. Following a number of experimental and demonstration vehicles, two prototype 250MPH 100-passenger inter-city vehicles, TRO6, were built, along with an elaborate 20-mile test facility where revenue service can be simulated. Following a period of initial testing by the Transrapid consortium, the operation of the test facility was turned over to a consortium of the German airlines (Lufthansa), German railroad (DB) and a testing house. This consortium is evaluating the suitability of the Transrapid MagLev for revenue service under the complete range of operating conditions. At this time, approximately 200 runs have been made, for a total of 7,000 miles at speeds up to 220MPH (the maximum achievable until the completion of the southern loop.)
Keywords
Magnetic levitation; Magnets; Propulsion; Rail transportation; Test facilities;
fLanguage
English
Journal_Title
Aerospace and Electronic Systems Magazine, IEEE
Publisher
ieee
ISSN
0885-8985
Type
jour
DOI
10.1109/MAES.1987.5005317
Filename
5005317
Link To Document