• DocumentCode
    926708
  • Title

    The Culham Laboratory hypervelocity test facility

  • Author

    Kear, M.J. ; Oxley, C.M. ; Burden, R.A.

  • Author_Institution
    Culham Lab., UKAEA, Abingdon, UK
  • Volume
    25
  • Issue
    1
  • fYear
    1989
  • fDate
    1/1/1989 12:00:00 AM
  • Firstpage
    290
  • Lastpage
    294
  • Abstract
    Culham Laboratory has designed and constructed a hypervelocity test facility (HTF) using electromagnetic launcher technology. Aimed at launching projectiles of approximately 1 gm to a velocity approaching 15 km/s, the facility is configured around an existing 1.1-MJ, 8-kV capacitor bank. The authors describe the electromagnetic launcher design and its power supply system and also report on its early operation. Theoretical performance is predicted and compared with experimental performance. A preliminary assessment of structural integrity, including rail and insulator damage, is presented
  • Keywords
    capacitor storage; electromagnetic launchers; power supplies to apparatus; test facilities; 1.1 MJ; 8 kV; Culham Laboratory hypervelocity test facility; capacitor bank; electromagnetic launcher; power supply system; structural integrity; Boring; Capacitors; Drag; Insulation; Laboratories; Projectiles; Railguns; Rails; Surface resistance; Testing;
  • fLanguage
    English
  • Journal_Title
    Magnetics, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9464
  • Type

    jour

  • DOI
    10.1109/20.22552
  • Filename
    22552