DocumentCode
927153
Title
Status and experience with the 2Mw Wts 75 at N¿¿Sudden, Gotland
Author
Mets, Viktor ; Hermansson, Ove
Author_Institution
Swedish State Power Board, Turbine Division, Technical Department, Wind Power Section, Kristinehamn, Sweden
Volume
130
Issue
9
fYear
1983
fDate
12/1/1983 12:00:00 AM
Firstpage
542
Lastpage
549
Abstract
The installation of two full-scale prototypes represents the major part of the Swedish wind-energy programme. The 2MW WTS 75 at N¿¿sudden is one of these installations. In the paper, the time schedule and presents status of this project is reported. WTS 75 is a two-bladed horizontal-axis upward machine with full-span pitchable blades. It is built for fully automatic and unattended operation and is designed for 30 years service life. A summary of essential performance characteristics and main data are given. The design concept and build up of different subsystems are described. Shop assembly and testing of components as well as testing of the complete assembled nacelle are described. Furthermore, methods applied for construction of tower foundation are shown. Lifting and installation of nacelle and turbine to the tower top are described. Finally a summary is given of activities during first operation, acceptance tests and full-scale evaluation.
Keywords
wind power plants; 2 MW WTS 75; Gotland; Nasudden; Swedish wind-energy programme; full-scale prototypes; installation; nacelle; two-bladed horizontal upward machine; wind power plants; wind turbine;
fLanguage
English
Journal_Title
Physical Science, Measurement and Instrumentation, Management and Education - Reviews, IEE Proceedings A
Publisher
iet
ISSN
0143-702X
Type
jour
DOI
10.1049/ip-a-1.1983.0083
Filename
4645946