• DocumentCode
    932167
  • Title

    On sequencing problems of repetitive production systems

  • Author

    Puquan, Xu ; Changyou, Liu ; Xinhe, Xu

  • Author_Institution
    Dept. of Autom. Control, Northeast Univ. of Technol., Shenyang, China
  • Volume
    38
  • Issue
    7
  • fYear
    1993
  • fDate
    7/1/1993 12:00:00 AM
  • Firstpage
    1124
  • Lastpage
    1128
  • Abstract
    The two-machine sequencing problem for a repetitive production system that is viewed as a deterministic discrete-event dynamic system is considered. The objective is to minimize the steady period, which is also the average weight of the critical circuit of the timed marked graph describing the system. The classification of the sequencing problems is done according to the ordering ranks of the ordering matrices. The two-machine sequencing problem is completely solved. The discussion is based on the theories of time-marked graphs and max algebra
  • Keywords
    discrete time systems; graph theory; matrix algebra; optimisation; production control; deterministic discrete-event dynamic system; graph theory; max algebra; optimisation; ordering matrices; production control; repetitive production systems; scheduling; timed marked graph; two-machine sequencing problem; Automatic control; Control systems; Control theory; Ear; Nonlinear control systems; Polynomials; Production systems; Publishing; Robots; State-space methods;
  • fLanguage
    English
  • Journal_Title
    Automatic Control, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0018-9286
  • Type

    jour

  • DOI
    10.1109/9.231469
  • Filename
    231469