DocumentCode :
935131
Title :
Economics and integration of hydro-electric plant in developing countries
Author :
Norris, T.E. ; Dwek, M.D.
Author_Institution :
Merz and McLellan Ltd., Newcastle upon Tyne, UK
Volume :
133
Issue :
3
fYear :
1986
fDate :
4/1/1986 12:00:00 AM
Firstpage :
121
Lastpage :
125
Abstract :
Rather than provide a general guide to the economic evaluation of hydro-electric schemes in developing countries, and to the assessment of their effect when integrated into the electricity systems, one scheme, the Lupohlo¿Ezulwini scheme first studied in 1978 and recently completed in Swaziland, is discussed in detail. Many of the aspects discussed will be common to other schemes. The paper is based on a presentation to an IEE Colloquium on Hydro-Power in May 1984.
Keywords :
economics; hydroelectric power stations; Lupohlo-Ezulwini scheme; Swaziland; developing countries; economic evaluation; electricity systems; hydro-electric plant; integration;
fLanguage :
English
Journal_Title :
Generation, Transmission and Distribution, IEE Proceedings C
Publisher :
iet
ISSN :
0143-7046
Type :
jour
DOI :
10.1049/ip-c:19860022
Filename :
4646781
Link To Document :
بازگشت