DocumentCode
935131
Title
Economics and integration of hydro-electric plant in developing countries
Author
Norris, T.E. ; Dwek, M.D.
Author_Institution
Merz and McLellan Ltd., Newcastle upon Tyne, UK
Volume
133
Issue
3
fYear
1986
fDate
4/1/1986 12:00:00 AM
Firstpage
121
Lastpage
125
Abstract
Rather than provide a general guide to the economic evaluation of hydro-electric schemes in developing countries, and to the assessment of their effect when integrated into the electricity systems, one scheme, the Lupohlo¿Ezulwini scheme first studied in 1978 and recently completed in Swaziland, is discussed in detail. Many of the aspects discussed will be common to other schemes. The paper is based on a presentation to an IEE Colloquium on Hydro-Power in May 1984.
Keywords
economics; hydroelectric power stations; Lupohlo-Ezulwini scheme; Swaziland; developing countries; economic evaluation; electricity systems; hydro-electric plant; integration;
fLanguage
English
Journal_Title
Generation, Transmission and Distribution, IEE Proceedings C
Publisher
iet
ISSN
0143-7046
Type
jour
DOI
10.1049/ip-c:19860022
Filename
4646781
Link To Document