• DocumentCode
    941116
  • Title

    Online multiobjective Pareto optimal dynamic scheduling of semiconductor back-end using conjunctive simulated scheduling

  • Author

    Sivakumar, Appa Iyer ; Gupta, Amit Kumar

  • Author_Institution
    Sch. of Mech. & Aerosp. Eng., Nat. Technol. Univ., Singapore, Singapore
  • Volume
    29
  • Issue
    2
  • fYear
    2006
  • fDate
    4/1/2006 12:00:00 AM
  • Firstpage
    99
  • Lastpage
    109
  • Abstract
    A discrete event simulation based "online near-real-time" dynamic multiobjective scheduling system has been conceptualized, designed, and developed to achieve Pareto optimal solutions in a complex manufacturing environment of semiconductor back-end. Our approach includes the use of linear weighted aggregation optimization approach for multiple objectives and auto simulation model generation for online simulation. Developed concepts are implemented at a semiconductor back-end site and are in use. The impact of the system includes a better customer delivery achievement, consistent cycle time with narrower distribution, improved machine utilization, reduction in the time that planners and manufacturing personnel spend on scheduling, and more predictable and repeatable manufacturing performance. In addition, it enables managers and senior planners to carry out "what now" analysis to make effective current decisions and "what if" analysis to plan for the future.
  • Keywords
    Pareto optimisation; discrete event simulation; dynamic scheduling; semiconductor device manufacture; Pareto optimal solution; conjunctive simulated scheduling; customer delivery; discrete event simulation; linear weighted aggregation optimization; machine utilization; multiobjective optimization; online multiobjective dynamic scheduling; semiconductor back-end; Discrete event simulation; Dynamic scheduling; Job shop scheduling; Optimal scheduling; Pareto optimization; Personnel; Processor scheduling; Production planning; Semiconductor device manufacture; Virtual manufacturing; Conjunctive simulated scheduling; Pareto solution; dynamic scheduling; multiobjective optimization; semiconductor back-end;
  • fLanguage
    English
  • Journal_Title
    Electronics Packaging Manufacturing, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    1521-334X
  • Type

    jour

  • DOI
    10.1109/TEPM.2006.872703
  • Filename
    1634451