DocumentCode
943711
Title
Systems engineering approach to the major capital projects in BP
Author
Francis, N.W.
Author_Institution
BP International Ltd., Projects Department, London, UK
Volume
133
Issue
6
fYear
1986
fDate
9/1/1986 12:00:00 AM
Firstpage
338
Lastpage
340
Abstract
Major capital projects in the petroleum industry are very costly, complex and must be planned for their whole lifetime of, say, 20 years. Projects progress through a series of distinct phases, each of which can be a breakpoint, before handing over to an operating company. Project management is the bringing together of the skills of different disciplines into the project team, and providing control interfacing with the subsystems that may each be major construction contracts. There is a shortage of experienced senior project managers, and a systems engineering approach provides a more rapid appreciation than can be gained purely through practical participation in a variety of projects over many years.
Keywords
management; petroleum industry; project engineering; systems engineering; BP; capital projects; petroleum industry; project management; systems engineering approach;
fLanguage
English
Journal_Title
Physical Science, Measurement and Instrumentation, Management and Education - Reviews, IEE Proceedings A
Publisher
iet
ISSN
0143-702X
Type
jour
DOI
10.1049/ip-a-1.1986.0050
Filename
4647826
Link To Document