• DocumentCode
    944763
  • Title

    Operational experiences from WTS-3 wind turbine, Maglarp, Sweden

  • Author

    M¿¿ller, L. ; Olsson, G.

  • Author_Institution
    Karlskronavarvet AB, After Sales Department, Department M1, Karlskrona, Sweden
  • Volume
    134
  • Issue
    5
  • fYear
    1987
  • fDate
    5/1/1987 12:00:00 AM
  • Firstpage
    431
  • Lastpage
    434
  • Abstract
    Operational experiences with a 3 MW wind turbine are described in the paper, covering two years of successful operation after commissioning. The total operation time covered by the paper is 7500 h, and total power production 11 500 MWh, including operation during precommissioning tests. Availability has been 63%.
  • Keywords
    wind turbines; 11500 MWh; 3 MW; 63% availability; 7500 h; Maglarp; Sweden; WTS-3 wind turbine;
  • fLanguage
    English
  • Journal_Title
    Physical Science, Measurement and Instrumentation, Management and Education - Reviews, IEE Proceedings A
  • Publisher
    iet
  • ISSN
    0143-702X
  • Type

    jour

  • DOI
    10.1049/ip-a-1.1987.0065
  • Filename
    4647935