DocumentCode
945470
Title
The Size of Research and Engineering Teams
Author
Kershner, R.B.
Author_Institution
Applied Physics Lab., The Johns Hopkins University, Silver Spring, Md.
Issue
2
fYear
1958
fDate
6/1/1958 12:00:00 AM
Firstpage
35
Lastpage
38
Abstract
This paper discusses the very common problem of overstaffing in a large development engineering effort. A number of the technical, organizational, and psychological problems that lead to inefficiency in the engineering effort are discussed. It is shown that because of this variation of efficiency with size, the ``usual´´ man-hour estimate may be meaningless. In fact, it is asserted that an increase in staff may actually lead to an increase in total time for accomplishing a development engineering effort. Finally, it is pointed out that the usual mechanisms for estimating efforts of new assignments may automatically perpetuate or even intensify an overstaffing problem.
Keywords
Aerospace engineering; Design engineering; Educational institutions; Linearity; Missiles; Personnel; Physics; Psychology; Radar; Testing;
fLanguage
English
Journal_Title
Engineering Management, IRE Transactions on
Publisher
ieee
ISSN
0096-2252
Type
jour
DOI
10.1109/IRET-EM.1958.5007455
Filename
5007455
Link To Document