• DocumentCode
    945470
  • Title

    The Size of Research and Engineering Teams

  • Author

    Kershner, R.B.

  • Author_Institution
    Applied Physics Lab., The Johns Hopkins University, Silver Spring, Md.
  • Issue
    2
  • fYear
    1958
  • fDate
    6/1/1958 12:00:00 AM
  • Firstpage
    35
  • Lastpage
    38
  • Abstract
    This paper discusses the very common problem of overstaffing in a large development engineering effort. A number of the technical, organizational, and psychological problems that lead to inefficiency in the engineering effort are discussed. It is shown that because of this variation of efficiency with size, the ``usual´´ man-hour estimate may be meaningless. In fact, it is asserted that an increase in staff may actually lead to an increase in total time for accomplishing a development engineering effort. Finally, it is pointed out that the usual mechanisms for estimating efforts of new assignments may automatically perpetuate or even intensify an overstaffing problem.
  • Keywords
    Aerospace engineering; Design engineering; Educational institutions; Linearity; Missiles; Personnel; Physics; Psychology; Radar; Testing;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IRE Transactions on
  • Publisher
    ieee
  • ISSN
    0096-2252
  • Type

    jour

  • DOI
    10.1109/IRET-EM.1958.5007455
  • Filename
    5007455