Title :
Analysis of Engineering Performance
Author_Institution :
Aero-Space Division, The Boeing Company, Seattle, Wash.
fDate :
6/1/1961 12:00:00 AM
Abstract :
An analytical scheme is presented for measuring the physical completion of engineering effort and relating this to the appropriate segment of a budget curve, representing planned expenditure of effort. The method was developed in connection with weapons systems projects. A measure (the delta factor) is devised of the variation of actual physical engineering completion from the standard or expected value. A computational algorithm for the delta formula is given. Illustrations are given of its use as a diagnostic tool.
Keywords :
Collaboration; Costs; Design engineering; Engineering drawings; Hardware; Performance analysis; Permission; Proposals; Testing; Writing;
Journal_Title :
Engineering Management, IRE Transactions on
DOI :
10.1109/IRET-EM.1961.5007594