Title :
The ``Core Concept´´ of Systems Management
Author :
McLean, James D.
Author_Institution :
General Dynamics/Electronics, Rochester, N. Y.
fDate :
6/1/1961 12:00:00 AM
Abstract :
Some deficiencies in the practice of systems management, and the need for an ``architect´´ in addition to the contractor are presented. The ``core concept´´ is described. Several advantages of this approach are indicated and its separation from hardware design and fabrication are stressed.
Keywords :
Blades; Design engineering; Engineering management; Gold; Knowledge engineering; Organizing; Relays; Reliability engineering; Rockets; Weapons;
Journal_Title :
Engineering Management, IRE Transactions on
DOI :
10.1109/IRET-EM.1961.5007597