    A Cost Control Extension of the PERT System

  • Author

    Beckwith, R. E.

  • Author_Institution
    Aeronutronic Division, Ford Motor Co., Newport Beach; University of Southern California, Los Angeles, Calif.
  • Issue
    4
  • fYear
    1962
  • Firstpage
    147
  • Lastpage
    149
  • Abstract
    The anticipated total cost of a complex project is placed on a simple statistical quality control basis, through a natural extension of the PERT system of management control. The method is designed to provide management with the earliest possible warning of a potential budget overrun, consistent with the uncertainties inherent in the basic data. The procedure, when applicable, can readily be made to augment standard PERT programs, thus providing an integrated package for the simultaneous (probabilistic) control of project time and project cost.
  • Keywords
    Control systems; Cost function; Industrial control; Packaging; Performance loss; Pricing; Project management; Quality control; Research and development management; Uncertainty;
  • fLanguage
    English
  • Journal_Title
    Engineering Management, IRE Transactions on
  • Publisher
    ieee
  • ISSN
    0096-2252
  • Type

    jour

  • DOI
    10.1109/IRET-EM.1962.5007695
  • Filename
    5007695