DocumentCode
947527
Title
A Cost Control Extension of the PERT System
Author
Beckwith, R. E.
Author_Institution
Aeronutronic Division, Ford Motor Co., Newport Beach; University of Southern California, Los Angeles, Calif.
Issue
4
fYear
1962
Firstpage
147
Lastpage
149
Abstract
The anticipated total cost of a complex project is placed on a simple statistical quality control basis, through a natural extension of the PERT system of management control. The method is designed to provide management with the earliest possible warning of a potential budget overrun, consistent with the uncertainties inherent in the basic data. The procedure, when applicable, can readily be made to augment standard PERT programs, thus providing an integrated package for the simultaneous (probabilistic) control of project time and project cost.
Keywords
Control systems; Cost function; Industrial control; Packaging; Performance loss; Pricing; Project management; Quality control; Research and development management; Uncertainty;
fLanguage
English
Journal_Title
Engineering Management, IRE Transactions on
Publisher
ieee
ISSN
0096-2252
Type
jour
DOI
10.1109/IRET-EM.1962.5007695
Filename
5007695
Link To Document