• DocumentCode
    949441
  • Title

    Power engineering effective solution triangle customer-consultant-manufacturer: a case history on meeting energy let-through requirements for a distribution transformer

  • Author

    Moylan, William J. ; McShane, C. Patrick ; Corkran, Jerry L. ; Pierce, Alan

  • Author_Institution
    Moylan Eng. Associates Inc, Livonia, MI, USA
  • Volume
    38
  • Issue
    6
  • fYear
    2002
  • Firstpage
    1714
  • Lastpage
    1721
  • Abstract
    Maximizing the reliability of a medium-voltage energy-delivery system requires an extensive amount of distribution engineering knowledge. When that system is to have the added flexibility of having its standby generators operate while tied into the utility grid, the depth of the knowledge needed increases significantly. In many cases, it would require more knowledge than many experienced consulting firms might possess. The standby generator project case history discussed in this paper involved a lesser known but very important code compliance issue. That issue became important when less-flammable oil-filled pad-mounted transformers were selected to provide an isolating link between those generators and the utility distribution system serving a commercial facility. The isolating link was intended to protect those generators from damage should they suffer ground faults. This paper is intended to point out two important facts. First, to provide an explanation and background of what is a lesser known, yet critically important, issue-specifically, the requirement that "maximum i2t let-through limits" for less-flammable transformers comply with NEC Listing requirements. Secondly, the paper points out how the broad network of talented engineers within the Industrial and Commercial Power Systems (I&CPS) Department of the IEEE Industry Applications Society was able to help the project\´s design engineer to both understand this issue and to assist in obtaining the equipment needed to successfully complete the project.
  • Keywords
    power distribution reliability; power transformers; standards; NEC Listing requirements; case history; code compliance; customer-consultant-manufacturer triangle; distribution transformer; energy let-through requirements; ground faults; isolating link; standby generators; Design engineering; History; Knowledge engineering; Medium voltage; Oil insulation; Power engineering; Power engineering and energy; Power system reliability; Reliability engineering; Standby generators;
  • fLanguage
    English
  • Journal_Title
    Industry Applications, IEEE Transactions on
  • Publisher
    ieee
  • ISSN
    0093-9994
  • Type

    jour

  • DOI
    10.1109/TIA.2002.804746
  • Filename
    1058129