• DocumentCode
    953094
  • Title

    Improving Electronic Reliability

  • Author

    Halio, Morris

  • Author_Institution
    Plans and Programs Office, Headquarters, U. S. Army Transportation Materiel Command, St. Louis, Mo.
  • Issue
    1
  • fYear
    1961
  • Firstpage
    11
  • Lastpage
    18
  • Abstract
    Each piece of military electronic equipment passes through various phases in its normal life cycle. These are: planning, design and development, pilot production, manufacture, transportation, storage, operation, and maintenance. Each of these stages is replete with opportunities for the introduction of unreliabilities. This paper points out the pitfalls which may be encountered and makes specific recommendations to avoid them, so that total potential reliability may be realized in the final equipment.
  • Keywords
    Amplitude modulation; Electronic equipment; Electronic equipment manufacture; Jamming; Maintenance; Manufacturing; Military equipment; Mobile communication; Power system reliability; Production planning;
  • fLanguage
    English
  • Journal_Title
    Military Electronics, IRE Transactions on
  • Publisher
    ieee
  • ISSN
    0096-2511
  • Type

    jour

  • DOI
    10.1109/IRET-MIL.1961.5008308
  • Filename
    5008308